Sailors coming out of basic training and attending the Naval Technical Training Center (NTTC) on board Naval Air Station Meridian will be pleasantly surprised to find their new quarters are brand new.
A ribbon cutting ceremony was held Tuesday to mark the conclusion of a $19.8 million project to renovate seven barracks and the Administration Building at Naval Technical Training Center on board NAS Meridian.
The seventh and final barracks will begin taking on Naval personnel in the next few days. The barracks will be able to handle approximately 1,000 sailors and according to Comm. Rusty Bownds who oversees the NTTC, the quality of life for the seamen just got much better.
"This will be the first home for most of these sailors right out of basic training so it will be much different than what they've seen," said Bownds. "These barracks will provide an increased level of comforts and amenities as they learn their trade here and ship out for other duties."
The project was awarded Sept. 27, 2006, to TJC Engineering of Louisville, Ky. Following completion of the design, work began on the first two buildings in January 2007. The first of the barracks was accepted Jan. 8, 2008, and students began moving in immediately.
Work included removal of all interior finishes (walls, ceilings, flooring, lighting and bathroom fixtures) and replacement with more durable and up-to-date materials including porcelain and ceramic tile flooring, impact and mold resistant gypsum board, energy efficient/adjustable direct and indirect lighting, new insulating windows and key card locking systems. A new outside air system was designed and installed to ensure the rooms are provided with conditioned outside air to meet new standards for indoor air quality. Barracks exterior "freshening" of the bulldogging included new handrails on the second and third floor walk ways, new exterior lighting and repair and painting of the exterior stucco finish.
"The older barracks were getting grungy and dated," said Bownds. "Now we are prepared to accommodate sailors as they are needed by the Navy and house them comfortably."
Each of the barracks includes 60 sleeping rooms in suites of four rooms with a common lounge. Typically each bedroom houses two "A" school students, though some are furnished with three beds, lockers, and desks to support increased student loading.
The Administration Building now houses NTTC Administration offices on the ground floor as well as the Personnel Customer Support Detachment and ID Card Center. The Liberty Center is located on the second floor. It has a large media room, Guitar Hero "rock out" room, and a sports game room. Computer and wireless access will be added soon.
The project was completed within budget and six months early.
Local News
Barracks officially opened for sailors
- Local News
-
- Voters face Saturday deadline
- Site of sub commissioning changed
- Dulaneys to reign over 2012 Meridian Mardi Gras Weekend
-
Local law enforcement officials honored
State Rep. Greg Snowden said he remembered as a child looking up to those "men in blue."
He said police officers in uniform were larger than life, riding in their patrol cars and carrying guns to protect and serve the population. Today, he said he is still in great admiration of the men and women who put their lives on the line every day so that citizens can feel safe. -
MPD probes vehicle crash
Evidence of a mother's desperate attempt to save her children from harm were spread all over a car lot — and could be seen on her as well in the form of bruises, cuts and scrapes.
Tuesday night, a vehicle with three children inside crashed through a plate glass showroom floor window damaging four new cars and totaling the vehicle the children were in. -
Skeleton found in residence
Members of the forensics team of the Mississippi Bureau of Investigation (MBI) were called to a dilapidated home in Chunky to probe the discovery of a skeleton.
-
Police search for robbery suspects
Two men who reportedly robbed a woman at gunpoint in the parking lot of a local bank are still being sought.
Mike Vick, public information officer with the Meridian Police Department, said the two men approached a woman about 8 p.m. Tuesday at the ATM of Regions Bank on North Hills Street. Vick said one of the suspects was armed with a handgun and after taking an undetermined amount of cash and the victim's car keys, the two suspects fled on foot. -
City cuts payment to Watkins
The Meridian City Council voted unanimously Tuesday to cut their monthly payment to David Watkins, project developer of Meridian's new police station, by $9,999 until work resumes on the project.
The order, made during the Meridian City Council meeting Tuesday morning, included a mutual agreement between the councilmen and Watkins to reduce the project developer's monthly consultant fee of $10,000 to $1, effective Tuesday. -
Crews work on gasoline pipeline
If you hear a loud, booming sound early today, between 4 a.m.-10 a.m., there is no cause for alarm.
Workers with Plantation Pipeline will be performing maintenance work on their 30-foot gasoline pipeline in the Meridian area to accommodate the widening of Highway 493. The location of the work activity will be at Highway 493 North and Oak Hill Baptist Church, just inside the city limits. -
Team Spirit
- More Local News Headlines





